As of May 17, after applying CCUS-EOR (carbon dioxide capture, utilization and storage-enhanced oil recovery) technology in the Niuquanhu East area of Santanghu Oilfield, Tuha Oilfield has achieved cumulative oil production increase exceeding 20,000 tons in the pilot block, with a recovery factor improved by 1.4%, effectively doubling production in the test area.